Location: St John’s Wood, London
Project: Full Refurbishment 40 self-contained luxury flats
WHPS Mechanical Ltd were appointed to complete Design and Build, Mechanical installation.
Including: Plumbing and Ventilation.
Year of completion: 2019
Description:
- Design – BIM, Revit, Magicad
- Above Ground Drainage – Polypipe PVC
- Hot and Cold Water Systems - Geberit Mapress, Buteline
- Sanitary Ware Installation – Hansgrohe, Villeroy & Boch
- Ventilation: Nuaire System 3 Continues Mechanical Extract Ventilation (MEV)
- Testing and commissioning