Location: Mayfair, London
Project: NEW Build family house
WHPS Mechanical Ltd were appointed to complete Design and Build, Mechanical installation.
Including: Heating and Plumbing.
Year of completion: 2015
Description:
- Design – CAD
- Above Ground Drainage – Polypipe PVC
- Hot and Cold Water Systems - Copper
- Sanitary Ware Installation – THG Paris, Hansgrohe, Duravit
- Heating including Polypipe wet underfloor heating (UFH), Vaillant boilers
- Gas Installation- Tracpipe
- Testing and commissioning