• +44 (0) 20 7953 0329
  • This email address is being protected from spambots. You need JavaScript enabled to view it.
Luxury Flat Refurbishment in St John’s Wood, London by WHPS Mechanical Ltd

Luxury Flat Refurbishment in St John’s Wood, London

Location: St John’s Wood, London

Project: Full refurbishment – 40 self-contained luxury flats

Year of Completion: 2019

Design and Build Mechanical Installation for 40 Luxury Flats in St John’s Wood

WHPS Mechanical Ltd was appointed to deliver the full Design and Build mechanical installation for the refurbishment of 40 self-contained luxury apartments in the prestigious area of St John’s Wood, London. Completed in 2019, the project involved comprehensive plumbing and ventilation systems designed for high-specification residential living.

Scope of Works

  • Design: Fully coordinated mechanical design using BIM, Revit, and Magicad
  • Drainage: Above ground drainage system using Polypipe PVC
  • Plumbing: Hot and cold water distribution using Geberit Mapress and Buteline pipework
  • Sanitary Ware: Premium fixtures by Hansgrohe and Villeroy & Boch
  • Ventilation: Nuaire System 3 MEV – Continuous Mechanical Extract Ventilation
  • Testing & Commissioning: Complete performance checks and system certification

Smart Engineering for Large-Scale Residential Refurbishment

This St John’s Wood development showcases WHPS Mechanical Ltd’s ability to deliver large-scale residential mechanical projects with precision and quality. Our use of BIM-based design ensured seamless integration with other trades and architectural elements, reducing installation errors and streamlining delivery.

By incorporating MEV ventilation and luxury plumbing systems, we helped transform the building into a comfortable, efficient, and high-end residential environment.

Partner with WHPS Mechanical Ltd

We provide complete mechanical design and installation services for residential refurbishments and conversions across London. Whether it's 10 units or 100+, WHPS delivers reliable systems for plumbing, drainage, ventilation, and sanitary ware with attention to quality and compliance.

bathroom plumbing preparation phase
shower tray drainage fitting
first fix mechanical installation
pipework supply and waste system
water heater cylinder st johns wood
boiler cabinet enclosure installation
flat bedroom refurbishment st johns wood
rainfall shower head bathroom reno
concealed shower valve renovation
modern bathroom suite double sinks


Contacts

+44 20 7953 0329

info@whps.biz

Westway House, Transport Ave, Brentford,
TW8 9HF

Working hours



Monday–Friday: 8:00 am – 6:00 pm
Saturday: closed
Sunday: closed